Compliance & specs
About
Project general facts
Nirvana Residences 1 by Meraki Developers is a refined residential project set on a prime corner plot in Dubai Production City, designed to stand out through its modern architecture and smart planning. The project offers a well-balanced mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom apartments. With efficient layouts, strong access, and an elegant design, project presents itself as a highly desirable option for both residents and investors.
The amenities at Nirvana Residences 1 are thoughtfully curated to support an active, relaxed, and social lifestyle. Residents can enjoy a beautifully designed swimming pool, indoor and outdoor gyms, outdoor yoga spaces, padel court, and inviting seating areas that create a resort-like feel. These facilities are seamlessly integrated into the podium and landscaped areas, offering a calm retreat within a vibrant urban setting.
Apartments at Nirvana Residences 1 are semi-furnished, ensuring convenience from day one while allowing residents to personalize their space. Kitchens come equipped with quality appliances, paired with modern cabinetry and practical layouts that enhance daily living. High-quality materials, elegant finishes, and large windows bring warmth, light, and a sense of understated luxury to every home.
Location description and benefits
Dubai Production City is a vibrant community designed to foster creativity and innovation, primarily catering to the media, production, and publishing industries. Strategically located near key highways, it offers excellent connectivity to Dubai’s major hubs, including the Dubai Marina and Al Maktoum International Airport. The area is characterized by its modern infrastructure, tailored to meet the needs of businesses, while also offering a dynamic environment for professionals and residents alike.
Beyond its business focus, Dubai Production City provides a balanced lifestyle with a range of amenities. Residential complexes within the district feature contemporary designs and cater to a diverse community. With parks, retail outlets, cafes, and fitness centers, the area promotes a lifestyle of convenience and leisure. Educational institutions and healthcare facilities within close reach further enhance its appeal as a well-rounded community.
Dubai Production City also emphasizes sustainability and green living, integrating eco-friendly practices into its design. Lush landscapes and open spaces are thoughtfully incorporated, providing a refreshing environment for residents and visitors. Whether you’re a business professional seeking a dynamic workspace or a family looking for a vibrant neighborhood, Dubai Production City offers a unique blend of innovation, comfort, and connectivity.
Available unit types
3 bedroom configurations
These thumbnails show sample layouts for each bedroom configuration. Actual unit sizes, orientations, and finishes vary across the 1 building — the developer's full floor-plan pack below covers every variant.

Studio
405 – 462 sqft
Range across 32 layout variants

1 bedroom
733 – 1052 sqft
Range across 84 layout variants

2 bedrooms
1215 – 1556 sqft
Range across 31 layout variants
Retail units
Layouts and pricing released on request.
Talk to a broker
Payment PlanInterest-free during construction
- 1.20%
On booking
- 2.20%
During construction
- 3.60%
Upon Handover (Q4 2028)
Calculate your payments
Pick a unit type or enter a custom price. We'll spread it across the plan's phases in AED + your selected currency, with plain-English timing labels. Download as a spreadsheet for your records.
| # | When | Step | % | Amount (AED) | Amount (USD) | Cumulative (USD) |
|---|---|---|---|---|---|---|
| 1 | Upon booking | Reservation | 20% | 140,700 | 38,313 | 38,313 |
| 2 | Between booking and Q4 2028 | During construction | 20% | 140,700 | 38,313 | 76,625 |
| 3 | Q4 2028 | Upon Handover (Q4 2028) | 60% | 422,100 | 114,938 | 191,563 |
| Total | 100% | AED 703,500 | USD 191,563 | |||
Cash-flow shape: 40% during the construction period (20% upon booking, 20% across milestones), 60% at handover (Q4 2028).
0% interest during construction — no APR, no compounding.
Opens directly in Excel, Numbers, or Google Sheets.
More questions?100% free advisory
Our advisors walk you through the math, the trade-offs, and the post-handover options. You don't pay us — ever.
Amenities
15 features
Location
25.03781, 55.20148
About Dubai Production City
A look at the original masterplan published by the developer at the time of the launch of Dubai Production City.
Explore Dubai Production CityAbout Meraki Developers

Discover the ultimate in upscale living with Meraki Developers. Their team is dedicated to creating communities that not only enhance the quality of life for they residents but also nurture individuals and foster a sense of belonging. With a focus on customer satisfaction and attention to detail, they strive to exceed your expectations and provide a truly unique and elevated living experience.
Building details

Studio, 1, 2 & 3 bedroom apartments
Parking allocation
| Unit type | Bedrooms | Spaces |
|---|---|---|
| Apartment | 0 | 1 |
| Apartment | 1 | 1 |
| Apartment | 2 | 1 |
| Apartment | 3 | 2 |
Marketing brochure
Why Dubai off-plan
The macro case for buying off-plan in Dubai
These six pillars apply to every project on this site — not just this one. If you're new to the UAE market, they're the context you need before evaluating the specific unit above.
0% interest, ever
Off-plan payment plans are interest-free, end to end. Every instalment is at face value — no APR, no compounding, no balloon hidden in the back. Buyers from interest-bearing markets routinely underestimate how much this saves over a 3–5 year hold.
No income or capital-gains tax on property
Dubai charges no annual property tax, no income tax on rental yield, and no capital-gains tax on resale. The DLD 4% transfer fee is a one-time cost at registration — after that, your returns are yours.
20% usually opens the unit
Most off-plan plans book with a ~20% reservation deposit. You're under contract with the developer immediately, with the rest spread across construction milestones. The deposit is what unlocks the buy-side, not the full unit price.
Post-handover plans extend the runway
Many projects offer 2–4 years of post-handover instalments — meaning a chunk of the price gets paid AFTER you take keys. Once the unit is rented, that income can help cover the post-handover payments — rarely the full instalment, but enough to make the cash-flow comfortable rather than tight.
Golden Visa from AED 2M
A property purchase of AED 2M+ qualifies the buyer (and family) for the UAE Golden Visa — a 10-year renewable residency. The visa is the headline benefit; for many international buyers it's the actual reason to buy in Dubai.
Freehold ownership for foreigners
Across the 80+ freehold zones (Dubai Marina, Downtown, Palm Jumeirah, Business Bay, JVC, Dubai Hills, and the rest), foreigners own 100% of the asset and the land. There's no Emirati partner requirement, no lease structure — title deed in your name.
Price
from AED 703,500
≈ USD 191,563
Talk to a Casadior broker


